Residential Project, Uttar Pradesh — 800 ACCL Meters
800+
Meters Installed
Residential — Multipoint DISCOM Metering
Sector
The Challenge
This residential project in Uttar Pradesh had individual DISCOM smart meters at every flat, with diesel generator (DG) backup for power continuity. Managing DG required a separate automatic changeover unit and a separate DG-side smart meter at each metering point — duplicating both device cost and wiring across the entire project. Residents, the builder, and the facility team raised concerns about this cost burden and approached PES Electrical for a better solution.
Our Solution
PES had engineered the PES-ACCL in-house specifically to solve this problem — and this project became its first field deployment. It was chosen as the proving ground precisely because the challenge here was so representative: individual DISCOM meters, DG backup, and the duplicated changeover + DG-meter cost at every flat that societies across multipoint DISCOM developments keep running into. 800 PES-ACCL meters were deployed, replacing two separate devices per flat (a standalone changeover unit and a DG smart meter) with one integrated device that works alongside the flat’s existing DISCOM meter.
The Result
The project eliminated the cost of a standalone changeover unit at every metering point, along with the extra wiring normally run between a separate changeover unit and a separate DG meter — real savings across all 800 units. Source-wise DG billing was accurate from day one, removing the estimate-based charges that typically trigger resident disputes. Deployed and running in production, it is now the reference deployment PES points to when specifying the ACCL for new multipoint DISCOM projects.
Need a similar solution?
Tell us your scale and sector — we will tailor a proposal.