Smart Metering for Integrated Townships — Built for Scale, Proven at 15,000+ Meters

One metering partner across every phase of your township — supply, installation, IoT billing, and support for the full life of the deployment. From the first plot to full occupancy, with a single point of accountability.

Smart Metering for Integrated Townships — Built for Scale, Proven at 15,000+ Meters

The Challenges You Face

  • Metering rolls out plot by plot over years — every new meter has to match the system already running in earlier phases
  • Multiple vendors across phases leave no single point of accountability when a reading or a bill is questioned
  • Thousands of units, mixed residential and commercial — grid and DG billing has to stay accurate at township scale
  • Handover to the RWA or facility team stalls when the metering platform is fragmented or unfamiliar
  • Buy the wrong system and you risk ripping meters out in a few years as standards and technology move on

How PES Solves It

  • Proven at township scale — 15,000+ meters at the Wave City integrated township and 10,000+ across BPTP, Noida. This is a track record, not a pilot.
  • One vendor, one platform across every phase — the meter in your final plot works exactly like the one in your first, and supply, installation, software, and support all sit with PES. No inter-vendor blame when something needs attention.
  • Phased rollout without rework — meters go in as each plot is built and connect straight to the same live system. Nothing is re-done or re-integrated as the township grows.
  • A network that grows with your township — because we build the meter end to end, its connectivity is designed to adapt as your site fills in: flexible for early, widely-spaced plots, then a more economical setup as density grows. No meters are replaced, and you are not locked into a costly connectivity plan for the life of the township.
  • Backed for the full life of your deployment — support that does not expire at an arbitrary 10-year mark. Meters we installed in 2012 are still running, and in all that time we have never charged a society to repair or replace one.
  • Future-proof by design — built to the latest BIS standard and updated remotely over the air, so new features and regulation changes are added without ever swapping out a meter.
  • In it for the long run — when metering technology moved on at one large township, we replaced several hundred meters free of charge to keep the entire site on one unified system.
  • Everything in-house in Faridabad since 2012 — manufacturing, testing, IoT software, and servers are all ours. BIS certified, defence-grade reliability, and no third-party dependency.
  • Accurate grid and DG billing across thousands of mixed-use units, and a clean handover — the RWA inherits a working management dashboard and a resident app, with PES on AMC from day one.

Frequently Asked Questions

Ready to modernise your metering?

Get a free site assessment or talk to our team today.